The Wharfside Building at China Basin Landing, a long six-story concrete building on the waterfront, with people on its stepped terraces and kayaks on the water

China Basin Landing

Corporate Office

Strengthening the past for today’s needs

NYA’s Role:
Structural Engineer
Location:
San Francisco, California
Owner:
McCarthy Cook & Company
Project Partners:
HOK (Architect)
Project Type:
Voluntary Seismic Upgrade
Original Construction:
1922
Building Height:
6 stories | Approximately 70 ft
Building Configuration:
825 ft long | 4 structurally separated sections

Overview

The Wharfside Building at China Basin Landing is a historic six story reinforced concrete structure built in 1922 along San Francisco’s waterfront. NYA designed a voluntary seismic upgrade that addressed the challenges of strengthening an aging, occupied building while minimizing disruption to its commercial tenants.

The innovative retrofit incorporated exterior steel buttress towers with 60 buckling restrained braces (BRBs), fiber reinforced polymer (FRP) strengthening, and micropile foundations. By positioning the new vertical seismic resisting system outside the building, the design provided a less intrusive approach to improving seismic performance while preserving the building’s functionality.

Challenges

Retrofitting the century old Wharfside Building presented an unusual engineering challenge, where the team was asked to strengthen an aging, occupied structure with severe spatial constraints and difficult waterfront conditions.

Severely Restricted Space
The narrow plaza between adjacent buildings left exceptionally limited room for a new seismic system while still requiring access around it.
High Capacity Braces, Limited Length
Braces with capacities reaching 1,200 kips had to fit within just 12–16 feet, severely limiting the available yielding length needed to accommodate seismic movement.
Complex Waterfront Foundations
Low basement ceilings restricted foundation installation, while substantial construction directly above the waterline added to the difficulty of the work.
Minimizing Tenant Disruption
With high value commercial tenants occupying the building, conventional retrofit methods risked significant noise, intrusive construction, and disruption to daily operations.

Together, these challenges demanded an innovative seismic retrofit strategy keeping all constraints in mind.

Exterior steel buttress towers with diagonal buckling restrained braces, standing in the narrow plaza beside the building

Exterior steel buttress towers with 60 buckling restrained braces, set in the narrow plaza between buildings

Solutions

To minimize disruption to the building’s commercial tenants, NYA developed a seismic retrofit strategy that positioned the new vertical lateral force resisting system (LFRS) entirely outside the existing structure. This approach utilized new exterior steel buttress towers with buckling restrained braces (BRBs), reducing the need for intrusive interior construction while providing additional seismic resistance.

The exterior system incorporated 60 high-capacity BRBs, ranging from 550 to 1,200 kips, within the narrow plaza between adjacent buildings. With available brace lengths limited to 12–16 feet, NYA utilized pinned connections to gusset plates to create compact connections and maximize the available yielding length of each brace. The exposed pinned connections also provided a clean, elegant appearance that complemented the surrounding plaza.

To connect the new exterior seismic system to the existing building, the retrofit incorporated fiber reinforced polymer (FRP) reinforcement, steel collectors, and shotcrete piers. The design also included new exterior concrete wall reinforcement extending from the basement level, providing additional structural strengthening while limiting the extent of interior interventions.

The foundation design incorporated micropiles installed under low clearance subterranean conditions, supporting large foundation elements despite restricted construction access. The design also accommodated the waterfront setting, where a significant portion of the exterior structural work occurred directly above the waterline.

The Wharfside Building along China Basin, with the historic steel drawbridge and the ballpark beyond, reflected in the water

Outcomes

The China Basin Landing seismic upgrade challenged the conventional approach to strengthening aging concrete buildings. Rather than relying on extensive interior structural interventions, NYA developed an exterior seismic resisting system that fundamentally rethought how a century old, occupied waterfront building could be strengthened while minimizing disruption to its tenants.

The project also demonstrated how significant engineering constraints could become opportunities for thoughtful structural design. The resulting retrofit accommodated unusually high seismic demands within an exceptionally restricted site, while the exposed structural elements contributed to a clean, architecturally integrated appearance.

Through this project, NYA proved how innovative engineering can extend the useful life of historic structures while meeting the demands of modern occupancy, and not compromising on seismic resilience, architectural character, and the operational needs of a commercial building.

Capabilities and Structural Systems

  • Seismic Retrofit Engineering
  • Innovative Structural System Design
  • Complex Foundation Engineering
  • Constructability Driven Engineering
  • Architectural & Structural Integration
  • Exterior Steel BRB Buttress Towers
  • Fiber Reinforced Polymer (FRP)
  • Shotcrete Piers & Steel Collectors
  • Micropile Foundations
The China Basin Landing buildings at a street corner, with an arched entrance and a China Basin banner

Project Leadership