Challenges:
A significant challenge included the design of a long-span glass atrium roof structure to connect the new facilities to the historic museum with modern glass detailing integrated with turn-of-the-century construction.Additional challenges included a mult-phase, extended construction schedule of over ten years and long-span column-free museum spaces.





